Renewable Energy
Logistics for renewable energy projects
Wind and solar projects need large volumes of equipment delivered in erection sequence, often to remote sites with limited access.
What makes this industry different
Wind projects include very long components such as blades and tower sections; solar projects involve large numbers of modules, mounting structures and substation equipment. Sites are often coastal, hilly or offshore.
Delivery rhythm must match the erection schedule so yards don't overflow and crews don't wait.
Challenges
Typical challenges
Very long components
Blades and tower sections exceed length limits and need suitable equipment and routes.
High volumes, many batches
Thousands of pieces must be tracked and delivered in sequence.
Remote sites, narrow access
Route surveys and waterway options may be required.
Solutions
How GLOGIMEX helps
- Project LogisticsPlanning and coordinating deliveries in erection sequence.View service
- Heavy Haul & OOG TransportTransport of oversized components and substation units.View service
- Engineering LogisticsRoute surveys and engineering for long components.View service
- Customs & WarehousingClearance and staging of imported equipment in batches.View service
FAQ
Frequently asked questions
At which stage can GLOGIMEX support renewable projects?
From logistics planning during procurement, through the international leg, customs and staging, to inland transport and delivery to site.
Are long components legally oversized?
If the loaded vehicle is longer than 20 m, wider than 2.5 m or higher than 4.2 m, it is oversized under Circular 12/2025/TT‑BXD and needs a circulation permit.
Let's build success together
Moving critical equipment for your project?
Whether you are preparing a new project, expanding a plant or moving critical equipment, GLOGIMEX is ready to support you with safe, reliable and efficient logistics solutions.
- Hotline+84 326 768 022
- Emailcontact@glogimex.com
- Office64-66 Vo Thi Sau Street, Tan Dinh Ward, Ho Chi Minh City, Vietnam