Moving Critical Cargo. Protecting Project Success.+84 326 768 022contact@glogimex.com
Loading steel frames onto trailers at the quay

Renewable Energy

Logistics for renewable energy projects

Wind and solar projects need large volumes of equipment delivered in erection sequence, often to remote sites with limited access.

What makes this industry different

Wind projects include very long components such as blades and tower sections; solar projects involve large numbers of modules, mounting structures and substation equipment. Sites are often coastal, hilly or offshore.

Delivery rhythm must match the erection schedule so yards don't overflow and crews don't wait.

Challenges

Typical challenges

  • Very long components

    Blades and tower sections exceed length limits and need suitable equipment and routes.

  • High volumes, many batches

    Thousands of pieces must be tracked and delivered in sequence.

  • Remote sites, narrow access

    Route surveys and waterway options may be required.

FAQ

Frequently asked questions

At which stage can GLOGIMEX support renewable projects?

From logistics planning during procurement, through the international leg, customs and staging, to inland transport and delivery to site.

Are long components legally oversized?

If the loaded vehicle is longer than 20 m, wider than 2.5 m or higher than 4.2 m, it is oversized under Circular 12/2025/TT‑BXD and needs a circulation permit.

Let's build success together

Moving critical equipment for your project?

Whether you are preparing a new project, expanding a plant or moving critical equipment, GLOGIMEX is ready to support you with safe, reliable and efficient logistics solutions.

Quick quote

Need to share dimensions or drawings? Use the full form →