Moving Critical Cargo. Protecting Project Success.+84 326 768 022contact@glogimex.com
Oversized equipment convoy on the road

Inland Transportation

Inland transportation from port to project site

Safe and efficient cargo transportation across Vietnam: road, heavy haul, inland waterway and last-mile delivery right to the project site.

The last leg is often the hardest

Industrial and energy sites are often far from ports, with narrow or unfinished access roads. For project cargo, the inland leg decides whether equipment arrives in time for installation.

GLOGIMEX combines road and inland waterway, choosing equipment per unit and route conditions so cargo reaches site safely and on schedule.

In-depth pageHeavy Haul & OOG TransportCircular 12/2025/TT‑BXD limits, cargo check tool, circulation permits →
Oversized equipment convoy on the road

Challenges

What the inland leg must account for

  • Unit size and weight

    Cargo beyond legal limits needs specialised equipment and circulation permits.

  • Route conditions

    Bridges, culverts, overhead lines and site access roads can restrict the options.

  • Site receiving conditions

    Laydown area, lifting equipment and delivery timing must match the construction plan.

Inland Transportation

Inland transport modes

  • Road

    Containers, general cargo and project cargo on suitable trucks, tractors and trailers.

  • Heavy haul

    Specialised equipment, transport engineering and permits for oversized and overweight units.

  • Inland waterway

    Barges for large units or where road routes are restricted.

  • Last-mile delivery

    Coordinating the final leg and receipt with the site team.

Approach

Our 5-step approach

  1. 01

    Understand

    Understand project objectives, technical requirements, schedules and stakeholder expectations.

  2. 02

    Plan

    Develop practical logistics solutions with safety, efficiency and risk control as key priorities.

  3. 03

    Coordinate

    Work closely with owners, EPC contractors, suppliers, carriers and site teams to ensure seamless execution.

  4. 04

    Deliver

    Execute safely, monitor continuously and respond proactively to keep the project moving.

  5. 05

    Support

    Provide continuous communication and logistics support until successful project completion.

FAQ

Frequently asked questions

When is waterway better than road?

When units are too large or heavy for the road route, or when the site is close to a river or port. Barge legs often reduce risk and route modification costs.

Does my cargo need a circulation permit?

Yes, if the loaded vehicle exceeds the size or weight limits under Circular 12/2025/TT‑BXD. You can check quickly with the tool on our Heavy Haul & OOG Transport page.

Do you also move containers inland?

Yes. GLOGIMEX road transport covers containers and general cargo, not only project cargo.

Let's build success together

Moving critical equipment for your project?

Whether you are preparing a new project, expanding a plant or moving critical equipment, GLOGIMEX is ready to support you with safe, reliable and efficient logistics solutions.

Quick quote

Need to share dimensions or drawings? Use the full form →